NEWS NEWS

back

Ostrogski Castle Ostrogski Castle

Works continue. Rubble is removed from the cellars, which are deepened to reach the designed levels. Until the end of July 2008 1000 m3 of rubble were removed.
The old electrical installation, the sewage system and the central heating system are being dismantled.    
As on level -2 on the side of Tamka Street there are interesting brick and stone patterns, a new project has been developed which uses the 70 m2, originally designed as storing space, as part of the exhibition. The under-floor channels are under construction. There are no delays. On 1 August 2008 the whole building was made available to the main contractor.


Show foto »
 
mini mini
mini mini