The House of Birth of Fryderyk Chopin in Żelazowa Wola - assumptions

The House of Birth of Fryderyk Chopin in Żelazowa Wola - assumptions

The House of Birth of Fryderyk Chopin in Żelazowa Wola - assumptions

2005
In order to extend the terrain of the Fryderyk Chopin Museum in Żelazowa Wola and to create good development conditions for this special place in accordance with the current international tourist business standards, with the consent of the Minister of Culture, in the autumn the Institute purchased the neighbouring plot.

The roof shingles in the House of Birth of the Composer were replaced, as well as the fire installations and the impregnation of the roof rafter framing.

Dendrological analysis of the trees in the park was carried out and a new inventory list with conservationist's directions was prepared. An analysis of water-sewage system for the revitalisation of the park and the objects situated in the vicinity of the Manor House in which Chopin was born was carried out. Expert opinion on the technical condition of the Manor House was obtained.

2006
Geo-technical analysis for the objects in the revitalised park. Trees-monuments-of-nature protected. Inventory of the Utrata River and the channel was made with the possibility to renaturate the Park in Żelazowa Wola.

Additionally a working project for the strengthening of the foundations of the Manor House was prepared. The final permission for the modernisation of the Manor House was obtained. A limited tender was opened for the construction work in the Manor House. Construction work in the Manor House started in November 2006.

At the beginning of 2008 a competition was opened, in accordance with the Public Contract Law, for the project of revitalisation of the Park-Manor House complex.

The competition for the architectonic arrangement concept of the Park-Manor House complex was won by STELMACH I PARTNERZY Sp. z o.o. from Lublin

In the autumn a contract was signed with this company for the realisation of the project.

2007
Till the end of March all the sanitary and electric installations in the Manor House were replaced, old plaster was removed and replaced with new plaster. An audio installation was added as well as a monitoring installation, which is part of an extended monitoring system for the whole park and all the objects on its terrain. At the end of April 2007 the renovation and modernisation of the Manor House was completed.

2008
At the beginning of 2008 the Institute obtained a permission to start the first stage of the Investment, i.e. to create the facilities for the Park on the newly acquired plot bordering the Park on the East.

On 6th May a limited tender for the construction work for the REVITALISATION OF THE TERRAIN OF THE MUSEUM OF THE HOUSE OF BIRTH OF FRYDERYK CHOPIN AND THE CONSTRUCTION OF TOURIST, ADMINISTRATION AND UTILITY INFRASTRUCTURE IN ŻELAZOWA WOLA for capacity objects was opened.

ARCHITECTONIC FORM
The new capacity objects should fit into the cultural and natural context of the park. Modernist form, contemporary materials, i.e. concrete, plywood and stone are used to create buildings glazed on the side of the park.

The architecture of the designed buildings alludes to the architecture of then historic buildings. The new buildings will use elements already used in Ýelazowa Wola: walls from granite stones, poles and ceilings from plywood, transparent glass in wooden frames. The colours will be natural: stone, alder wood, glass minimally tinted en masse.

FUNCTIONS OF OBJECTS
BUILDING A
- a newly designed service building. This is the entry and the reception with a small square in front of the building, in the area of the present ticket office. It will have the capacity to serve many people at the same time. This building is a one-floor garden pavilion. Its entry is separated from the square with stone poles, made of the same material as the fence. One wall of the building is formed from the existing Park fence, the other wall is open to the Park. Cafe and temporary exhibition spaces are in a separate orangery.

BUILDING B (the current administration building) - the existing ground floor rooms will be rearranged and adapted for the security and the administration, in the attic - the existing guestrooms will be rearranged.

BUILDING C - a newly designed public utility building. In the front part there is the entry from the present parking, leading to the newly designed passage for pedestrians and then to the transparent reception hall, behind which the concert hall is situated. On the opposite side of the reception hall there is a restaurant for 40 people. Glass walls of the building allow people to see the park from the street and from the parking lot. The northern wall is full, made of stone, the same as the fence. The southern wall is light - transparent - it opens into the park. The wall of the concert hall is in two colours, it is made from round granite stones.

BUILDING D - the existing utility building redesigned as a kitchen with its facilities. The roof is partly glazed, so that the existing balcony can be used a small dining room. To the redesigned utility building a new space is added: a restaurant, a hall and a multifunctional concert hall. An important element of this concept is to add in front of the redeveloped building a wooden trellis to create a summer garden shaded with a sail cotton awning, which will connect the old building with the new.

BUILDINGS E and F- new utility buildings for the park, situated on the plot no 33. A greenhouse (situated on the side of the park), garage-storehouse and a technical-administrative building. The existing utility building tore down.
One floor buildings without cellars. Layered walls with granite stone in the elevation. Buildings connected with wooden trellises. This plot is connected with the Park in the East, the passage is used e.g. during concerts for stage support.

BUILDING G - new roofing over the stage with the backstage space. The roofing over the stage "on the water" is only for the summer season. It is made of cotton spread over a plywood structure. Behind the acoustic wall backstage facilities are located. They are not visible from the amphitheatre.

BUILDING H - the building housing the hydrophore is modernised. A new building - corresponding in its form to the other buildings and made of similar materials - replaces the old building.

BUILDING I - a new general access sanitary building, corresponding in its form to the other buildings and made of similar materials.

  